Electrical Supply to Pars Special Economic Energy Zone
Project Brief Description
Project Title |
: |
Electrical Supply to Pars Special Economic Energy Zone |
Client |
: |
Pars Special Economic Energy Zone Company |
Consultant |
: |
Tarh-o-Palayesh Engineering Company |
Type of Contract |
: |
Design Completion, Management and Supervision on EPC Contractors |
Duration of Project |
: |
From 2004 to 2009 |
Cost Estimation |
: |
53 BILLION RIALS equivalent € 4,820,000 |
Engineering Man Hour |
: |
270,000 |
Project Brief Description
|
:
|
P.S.E.E.Z. is located in Assaluye, near the South Pars Gas Field which is one of the most important economic poles in Iran. In order to supply electricity to the region, an independent power network has been designed that will be able to connect to the national electricity network in the future. Network power is supplied from a power plant with an initial capacity of 300 MV, which can be expanded up to 1000 MV. Production of this power plant is transferred to a number of 132/33 kV substations by a 132 kV transmission line and then using high pressure cables and a set of downstream 33/0.4 kV substations is distributed in the area. The scope of work of the project is from the output of the main power plant to the beginning of the 400 V distribution network and according to the nature of the work, it has been divided into three main parts and had assigned to four different subcontractors. Supervising the design and implementation stages of projects, as well as completing the design and review and study of the stability reliability of the network from the production stage to the consumption stage and elimination of defects has been done by Tarh o Palayesh Engineering Company.
|
Project scope of work
|
|
|
|
|
|
|
|