Aghar & Dalan Gas Fields Development Project

TarhoPalayesh

Project Brief Description

Project Title                      

:

Aghar & Dalan Gas Fields Development Project

Client

:

National Iranian South Oil Fields Company

Consultant

:

Tarh-O-Palayesh Engineering Company

Type of Contract

:

Feasibility Study, Basic and Preliminary Engineering design

Duration of Project

:

From 1984 To 1987

Cost Estimation

:

600,000,000 USD

Engineering Man Hour

:

237,000

Project Brief Description

 

 

 

 

:

 

 

 

 

 

NIOEC intends to produce, transfer and treat gas from Aghar & Dalan gas fields, with a nominal capacity of 1400 MMSCFD gas and 15000 BPD condensate. The project includes wellhead facilities, gas gathering systems, manifolds, treating plant consists of inlet slug catchers, separation units, dehydration unit and stabilization unit. Feasibility and conceptual studies, basic design and preparation of material requisitions have been performed by TOP engineering co.

 

 

Project scope of work

  • 9 wellhead facilities at Dalan gas Field
  • 11 wellhead facilities at Aghar gas Field
  • Dalan gas gathering system consists of 3 manifolds and 80 km of 6″ to 14″ pipelines
  • Aghar gas gathering system consists of 4 manifolds and 140 km of 8″ to 14″ pipelines
  • Dalan treating plant (DTP) consists of inlet slug catchers, separation units, dehydration unit and stabilization unit
  • Aghar central facilities (ACF)
  • 90 km gas & condensate transmission pipelines from Aghar to Dalan.
  • Dalan Power Plant
  • Dalan Residential Complex

The main volumes of project implementation

Project Image Gallery

Related projects

2-9

Iran –Kuwait Gas Export Project