Kish Gas Field Development Project

TarhoPalayesh

Project Brief Description

Project Title              

:

KISH Gas Field Development Project

Client

:

Petroleum Engineering and Development Company

Consultant

:

Tarh O Palayesh Engineering Company

Type of Contract       

:

Conceptual Studies, Basic & Detail Engineering, Supervision and Management Contract

Duration of Project

:

From 2007 to 2014

Cost Estimation   

:

1,744,720,000€

Engineering Man Hour

:

1,084,200

Project Brief Description

 

 

 

:

 

 

 

 

KISH Gas Refinery will be constructed for treating of gas from KISH gas field, with a nominal capacity of 3000 MMSCFD at three phases. In phase 1, 1000 MMSCFD of reservoir fluid from 13 production wells will be delivered to gas plant via one multiphase sea pipeline. It includes reception facilities, sweetening, dehydration, dew pointing, export gas compression, glycol/MEG regeneration & injection, liquid gas stabilization and back-up, sour water stripping, utilities and off-site units.

The stabilized condensate will be stored in three floating roof tanks within the gas plant and will be transported to a SBM to be exported by tankers. Dry sweet gas is then transported via a 94km, 56” pipeline to its tie-point with IGAT-7

Project scope of work

KISH Clusters Facilities: Capacity: 1000MMSCFD ,13 Wellheads at Two Separated Area
On Shore Pipelines & Metering Station: 4.8km, 24” – 5.8km, 32” – 11.6km, 4” – 94km, 56”
Off Shore Pipelines & SBM: 17km, 32” – 17km, 4” – 5km 30” and SBM Capacity: 500m3h
Electrical Power Plant & Steam Generation: Capacity :20MV – HP Saturated Steam: 46brg – Buildings & Shelters: 7,280m2
Sea Water Intake & Water Treatment: Capacity: 11000 m3h, Buildings & Shelters 2,280m2
Waste Water Treatment: Domestic & Chemical Sewers & Oily Water
KISH Gas Refinery: Capacity: 1000MMSCFD – Buildings & Shelters: 31,6000m2
Telecommunication Systems: 100km Fiber Optic – PABX, Radio Multiplex
Main Access Road: 2km Two Lane Road
KISH Offices, Guest House & Warehouses Area: Buildings & Shelters: 6,810m2
Construction Supervision Camp: Buildings & Shelters: 4,990m2

The main volumes of project implementation

Project Image Gallery

Related projects

Picture7-1

MPC 16” & 30” (IG6/NGL1500 & NGL1500/MCS) Gas Pipelines MC Services

5

SOHRAB Oil Field Development Project

5

Conceptual Study to Review and Complete the Fire Detection and Extinguishing System

4-1

Supervision Services for Feasibility Study and Basic Design of Needle Coke Production Project