Esfahan Refinery Development and Revamping Project (EPCC)

TarhoPalayesh

Project Brief Description

Project Title              

:

Esfahan Refinery Development and Upgrading Project

 

Client

:

Esfahan Oil Refining Company

 

Consultant

:

Tarh-o-Palayesh Engineering Company

 

Type of Contract       

:

EPC

 

Duration of Project

:

From 2007 to 2014

 

Cost Estimation   

:

RLS 4190 Billion equivalent 325€ Million

 

Engineering Man Hour

:

2,182,000

 

Project Brief Description

 

 

 

 

 

:

 

 

 

 

 

 

In order to increase the refining capacity of Esfahan Refinery to 360,000 bbl/day, Esfahan Oil Refining Company has defined the above mentioned project. This project includes installation of new units (B1), Revamping of the existing units (B2) and upgrading of the control system (B3).

The B1 sub-project includes atmospheric distillation unit and LPG, Kerosene treating package and new flare unit.

The B2 sub-project includes CDU, VDU and SRG in both trains, LPG in both trains, Naphtha storage tank and transmission system, waste water treatment system, fuel system, water system, air system, steam and power system, nitrogen distribution system and interconnection facilities.

The B3 sub-project includes modifying and changing the control and protection systems of the existing units and replacing existing pneumatic systems by modern electronic system.

Basic Engineering Endorsement, Detailed Design and part of Material Supply and Construction have been performed by TOP Engineering Co.

Project scope of work

  • Installation of New CDU/LPG3 unit
  • Development and capacity increase of existing CDU/LPG Units
  • Development and capacity increase of fuel, water, air, steam, nitrogen, waste water treatment and flare systems
  • Installation of Naphtha storage tank and associated transmission systems
  • Modifying and changing the control and protection system of existing units

The main volumes of project implementation

Earth Work 283,000 m3
Concrete 50,885 m3
Buildings & Shelters 2,647 m2
Fenced / Bounded Area 217,000 m2
Steels Structure 5,030 Ton
Cabling Length 530,000 m.
Piping 504,000 Inch-Dia
Equipment installation 8,715 Ton