Ahwaz Steel Complex Direct Reduction Plant

TarhoPalayesh

Project Brief Description

Project Title                      

: Ahwaz Steel Complex Direct Reduction Plant

Client

: Ahwaz Steel Company

Consultant

: Tarh-o-Palayesh Engineering Company

Type of Contract

:

Detail Engineering Study & Preparation of tender documents

Duration of Project

: From 1984 to 1987

Cost Estimation

: 100,000,000 USD

Engineering Man Hour

: 235,000

Project Brief Description

 

 

 

:

 

 

 

 

In order to produce 3,000 MTPD sponge iron from iron pellets in Ahwaz steel complex by using gas based HYL direct reduction and MIDREX direct reduction methods, in a reactor at temperatures below the melting temperature, the oxygen in the iron ore is removed and its structure becomes spongy porous. In this regards completion of details engineering, preparation residue items list and purchase order for reformers, reactors, cooling towers and furnaces, preparation tender documents and supervision have been performed by TOP engineering Co.

Project scope of work

  • 3000 MTPD Hyl direct reduction unit including reformers, reactors, cooling towers and heaters
  • Material handling system
  • Auxiliary facilities such as air system, inert gas system, fuel gas and service water system

The main volumes of project implementation

Project Image Gallery

Related projects

Picture1-1

SPGC Refineries Safety Systems Upgrading Project

Picture5

Kish Gas Field Development Project-Phase 1 BDP & FEED Stage

3-2

Engineering and Technical Services for N.I.O.P.D.C.

5-1

NISOC Flare Gas Recovery Facilities