Esfahan DMT Factory Waste Water Treatment Unit Project
TarhoPalayesh
Project Brief Description
Project Title |
: |
Esfahan DMT Factory Waste Water Treatment Unit Project |
Client |
: |
Fiber Intermediate Production Company |
Consultant |
: |
Tarh-O-Palayesh Engineering Company |
Type of Contract |
: |
Basic, Detail Engineering and Preparation of Material Requisitions |
Duration of Project |
: |
From 1989 To 1990 |
Cost Estimation |
: |
500,000 USD |
Engineering Man Hour |
: |
9,000 |
Project Brief Description
|
:
|
In order to gather, separate, treat and neutralize the waste water, Fiber Intermediate Production Company intends to install waste water treatment system and required facilities. Basic, detail design and preparation of material requisitions have been performed by TOP engineering co
|