HAFTKEL Oil Field Process System Optimization Project

TarhoPalayesh

Project Brief Description

Project Title              

:

HAFTKEL Oil Field Process System Optimization Project

Client

:

National Iranian South Oil Company

Consultant

:

Tarh-o-Palayesh Engineering Company

Type of Contract       

:

Basic Design and Preparing FEED Package

Duration of Project

:

From 2004 to 2005

Cost Estimation   

:

RLS 547 Billion equivalent € 49,440,000

Engineering Man Hour

:

23,000

Project Brief Description

 

:

 

 

Construction of production unit and oil pump station with a capacity of 25,000 bbl /day, 12 km of gas transmission pipeline, and gas compressor station with a capacity of 11 MMSCFD for associated gas is aimed to be done to optimize the process system of Haftkel oil field and also to gather and inject the solution gas of this field. Preliminary engineering studies and preparation FEED package has been performed by TOP engineering Co.

Project scope of work

  • Construction of manifold and cluster with a capacity of 8,000 bbl/day in Haftkel-1 area
  • Production unit and oil pump station with a capacity of 25,000 bbl/day
  • Gas compressor station for associated gas with a capacity of 11 MMSCFD
  • Construction of almost 12 km gas pipeline from Haftkel manifold and cluster to the Haftkel Central Facilities
  • Construction of required utilities

The main volumes of project implementation

Earth Work 38000 m3
Concrete 11500 m3
Buildings & Shelters 6136 m2
Fenced / Bounded Area 65000 m2
Steels Structure 805 Ton
Pipeline Length 44 Km.
Cabling Length 50 Km
Pipeline/ Piping 89800 Inch-Dia
Equipment installation 296 Ton

Project Image Gallery

Related projects

3-8

Marun Khami Gas Condensate Transmission and Exportation Project

logo-1

TOTAL SOUTH PARS – OPERATOR TRAINING SIMULATOR (OTS)

3-2

Karanj-O-Parsi Gas Gathering and Injection Increase Project

4-8

South Gashu Gas Field Development Project