HAFTKEL Oil Field Process System Optimization Project
Project Brief Description
Project Title |
: |
HAFTKEL Oil Field Process System Optimization Project |
Client |
: |
National Iranian South Oil Company |
Consultant |
: |
Tarh-o-Palayesh Engineering Company |
Type of Contract |
: |
Basic Design and Preparing FEED Package |
Duration of Project |
: |
From 2004 to 2005 |
Cost Estimation |
: |
RLS 547 Billion equivalent € 49,440,000 |
Engineering Man Hour |
: |
23,000 |
Project Brief Description
|
:
|
Construction of production unit and oil pump station with a capacity of 25,000 bbl /day, 12 km of gas transmission pipeline, and gas compressor station with a capacity of 11 MMSCFD for associated gas is aimed to be done to optimize the process system of Haftkel oil field and also to gather and inject the solution gas of this field. Preliminary engineering studies and preparation FEED package has been performed by TOP engineering Co. |
Project scope of work
|
|
|
|
|
The main volumes of project implementation
Earth Work | 38000 | m3 |
Concrete | 11500 | m3 |
Buildings & Shelters | 6136 | m2 |
Fenced / Bounded Area | 65000 | m2 |
Steels Structure | 805 | Ton |
Pipeline Length | 44 | Km. |
Cabling Length | 50 | Km |
Pipeline/ Piping | 89800 | Inch-Dia |
Equipment installation | 296 | Ton |