Iran North –West Gas Supply Project

TarhoPalayesh

Project Brief Description

Project Title                      

:

Iran North –West Gas Supply Project

Client

:

National Iranian Gas Company

Consultant

:

Tarh-O-Palayesh Engineering Company

Type of Contract

:

Feasibility Study, Basic and Detail Engineering

Duration of Project

:

From 1982 To 1983

Cost Estimation

:

470,000,000 USD

Engineering Man Hour

:

43,000

Project Brief Description

 

 

 

 

:

 

 

 

 

 

In order to supply gas to Eastern & Western Azarbaijan, NIGC intends to install 30″ gas transmission pipelines from Astara Tabriz. Feasility study, basic and detail design of pipelines and marketing and data preparation of city network gas for Ardabil, Sarab, Bostanabad and Tabriz have been performed by TOP Engineering Co.

 

 

 

Project scope of work

  • Astara/ Tabriz 30″ gas tramsmission pipelines
  • City gas network for Ardabil, Sarab, Bostanabad and Tabriz

The main volumes of project implementation

Project Image Gallery

Related projects

3-8

Marun Khami Gas Condensate Transmission and Exportation Project

logo-1

TOTAL SOUTH PARS – OPERATOR TRAINING SIMULATOR (OTS)

logo

HAFTKEL Oil Field Process System Optimization Project

3-2

Karanj-O-Parsi Gas Gathering and Injection Increase Project