Iran-Japan Petrochemical Complex Feedstock Project (PAJ 1 &2)
Project Brief Description
Project Title |
: |
Iran-Japan Petrochemical Complex Feedstock Project (PAJ 1 &2) |
Client |
: |
National Iranian South Oil Company |
Consultant |
: |
Tarh-O-Palayesh Engineering Company |
Type of Contract |
: |
Detailed Engineering Study, Preparation of Tender Documents and Engineering Services |
Duration of Project |
: |
From 1982 to 1986 |
Cost Estimation |
: |
950,000,000 USD |
Engineering Man Hour |
: |
680,000 |
Project Brief Description
|
:
|
The required feed of Bandar Imam Petrochemical Company (BIPC), in approximate capacity of 260 MMSCFD dry gas and 120 MBPD NGL, is aimed to be supplied from Ahwaz and Marun Oil Fields. The produced gas from second, third and fourth stages of 11 production units from Ahwaz 1~5 and Marun 1~6 are gathered and transferred to Marun PUI Slug catcher and Ahwaz slug catcher by 130 km pipeline network and then transferred to 700/800 NGL plants. Dry gas and NGL produced by propane refrigerant cycle in these plants, are then separately transmitted to BIPC by two 16” pipelines in approximate length of 94.5 km. In this manner, technical evaluation, completion of detailed engineering, preparation of EPC tender documents and various engineering services have been performed by TOP Engineering Company. |
Project scope of work
|
|
|
|