Aghar & Dalan Gas Fields Development Project
Project Brief Description
Project Title |
: |
Aghar & Dalan Gas Fields Development Project |
Client |
: |
National Iranian South Oil Fields Company |
Consultant |
: |
Tarh-O-Palayesh Engineering Company |
Type of Contract |
: |
Feasibility Study, Basic and Preliminary Engineering design |
Duration of Project |
: |
From 1984 To 1987 |
Cost Estimation |
: |
600,000,000 USD |
Engineering Man Hour |
: |
237,000 |
Project Brief Description
|
:
|
NIOEC intends to produce, transfer and treat gas from Aghar & Dalan gas fields, with a nominal capacity of 1400 MMSCFD gas and 15000 BPD condensate. The project includes wellhead facilities, gas gathering systems, manifolds, treating plant consists of inlet slug catchers, separation units, dehydration unit and stabilization unit. Feasibility and conceptual studies, basic design and preparation of material requisitions have been performed by TOP engineering co.
|
Project scope of work
|
|
|
|
|
|
|
|
|