Project Title |
: |
Construction of Solar Energy System in T.O.P. Office NO. 2. |
Client |
: |
Tarh-O-Palayesh Engineering Company |
Consultant |
: |
Tarh-O-Palayesh Engineering Company |
Type of Contract |
: |
Engineering, Procurement, Construction and Financing (EPCF) |
Duration of Project |
: |
From 2018 to 2019 |
Cost Estimation |
: |
1,487,331,920 RLS Equivalent to 11,757 € |
Engineering Man Hour |
: |
4,500 |
Project Brief Description |
:
|
Construction of off grid photovoltaic solar energy system with a nominal rated production capacity of 2.65 kw, in T.O.P. Office no. 2, for the purpose of applying the studies of renewable energies in to providing solar energy EPC services to domestic consumers and determine the structure and engineering requirements. |
Project scope of work
·Solar System Simulation in PVsyst |
·Panels Optimal Placement |
·Preparation of SLD, Block Diagram, Cable Routing, etc. |
·Steel Structure Design |
·Equipment Procurement |
·Installation, Construction, Commissioning and Operating |
The main volumes of project implementation
Photovoltaic Panel | 10 | No. |
Charge Controller | 1 | No. |
Inverter | 1 | No. |
Battery | 8 | Cell |
Cabling and Wiring | 252 | m. |
Steel Structure | 423 | Kg. |
Curbstone | 18 | No. |