NISOC Gas Pipelines

TarhoPalayesh

Project Brief Description

Project Title              

:

NISOC Gas Pipelines

Client

:

National Iranian South Oilfields Company (NISOC)

Consultant

:

Tarh o Palayesh Engineering Company

Type of Contract       

:

Detail Design and Preparation of PC Tender Documents

Duration of Project

:

From 2015 to 2018

Cost Estimation   

:

IRR 7,202,770,000,000 equivalent €148,000,000

Engineering Man Hour

:

109,250

Project Brief Description

 

 

 

 

 

 

:

 

 

 

 


 

 

In order to maintain production continuity & safe operation, NISOC, by defining this project intends to develop parts of pipelines & relevant facilities including 1) Five 16″ pipelines with total length of 26Km from Marun gas injection unit to a new 16″ header with a length of 29Km in order to inject gas in 16 wellheads of Marun oilfield through 6″ branches with total length of 13 Km including 8 pig launching/receiving stations and 2) Three 20″ pipelines with a total length of 55Km and a 24″ pipeline with a length of 32.5Km collecting associated gas from Marun production units to feed NGL plants including 8 pig launching/receiving stations and 3) Aghajari gas lifting ring, 6&8″ in size and 122Km in length plus, 4″ branches to 107 wellheads of Aghajari oilfields with total length of 103Km including wellhead facilities upgrading and 5 pig launching/receiving stations and 4) One 20″ pipeline with a length of 7.7Km that starts from Karanj sludge catcher  unit No. 300/500 to inject gas in 6 wellheads of Karanj oilfield. Detail engineering services as well as PC tender documents preparation has been performed by TOP Engineering Co.

Project scope of work

  • Marun gas injection unit development
  • 16″ pipelines A~E from Marun gas injection unit to header H
  • 16″ header H between Marun gas injection wellheads No. 134 & 135
  • 6″ branches from header H to 16 Marun gas injection wellheads
  • Developmment of Marun production units No. 1,2,5&6 and NGL300 & NGL400
  • 20″ pipeline from Marun production unit No 6 to 1
  • 20″ pipeline from Marun production unit No 1 to NGL400
  • 20″ pipeline from Marun production unit No 2 to NGL400
  • 24″ pipeline from Marun production unit No 5 to NGL300
  • Development of Aghajari gas lifting feed facilities close to Marun gas injection wellhead No. 134
  • Aghajari gas lifting ringed pipeline
  • Branches from Aghajari gas lifting ring to 107 wellheads
  • Development of 107 Aghajari wellheads facilities
  • Karanj sludge catcher unit No. 300/500 development
  • 20″ pipeline from Karanj sludge catcher  unit No. 300/500 to Karanj wellhead No. 16

The main volumes of project implementation

Earth work

Concrete

Buildings & Shelters

Fenced / Bounded area

Steel structure

Pipeline installation

Piping installation

Cable laying

Equipment installation

 

 

23,300,000

30,000

200

35,000

530

390

430,000

50

110

 

 

m3

m3

m2

m2

Ton

Km

Inch-Dia

Km

Ton

 

 

Project Image Gallery

Related projects

4-1

Rey-Sari Oil Product Transmission System Capacity Increase Project

6-2

West Karun Oil Transmission Capacity Increase

5-5

NISOC Oil Pipelines Project

3-8

Marun Khami Gas Condensate Transmission and Exportation Project