NISOC Oil Pipelines Project

TarhoPalayesh

Project Brief Description

Project Title              

:

NISOC Oil Pipelines

Client

:

National Iranian South Oilfields Company (NISOC)

Consultant

:

Tarh o Palayesh Engineering Company

Type of Contract       

:

Detail Design and Preparation of PC Tender Documents

Duration of Project

:

From 2015 to 2017

Cost Estimation   

:

IRR 5,221,558,000,000 equivalent €108,000,000

Engineering Man Hour

:

73,400

Project Brief Description

 

 

 

 

 

:

 

 

 

 

 

 

In order to maintain production continuity & safe operation, NISOC, by defining this project intends to develop parts of pipelines & relevant facilities including 1)Two 42″ pipelines, both equipped with leak detection system, with total length of 52Km from Omidiyeh pump station (mile 7/77) to Aghajari three-way Junction to bypass Omidiyeh urban area including one pig launching station and 2) One 12″ pipeline with a length of 56Km from Darreh Rig to Sabzab valve station, equipped with leak detection system to bypass Dezful urban area including one launching/receiving station and, 3) one 30″ pipeline from Marun No. 1 production unit to Omidiyeh pump station (mile 7/21) with a length of 73Km, connecting to midway existing facilities tie-in points and fully equipped with leak detection system including two launching/receiving stations and 4) over 450Km of existing pipelines equipped with new leak detection system Detail engineering services as well as PC tender documents Preparation has been performed by TOP Engineering Co.

Project scope of work

 

  • Omidiyeh pump station development (mile 7/21 & 7/77)
  • 42″ pipeline from Omidiyeh pump station to Aghajari three-way Junction
  • Sabzab valve station development
  • 12″ pipeline from Darreh Rig to Sabzab valve station
  • 12/20″ pipeline from Lab Sefid to Marun No. 1 production unit
  • Marun production units No. 1,2,3,4&5 manifold areas development
  • Kupal manifold area development
  • Strategic storage tanks manifold area development
  • Jarahi river up/downstream manifold areas development
  • Mile 0 manifold area development
  • 30″ pipeline from Marun No. 1 production unit to Omidiyeh pump station
  • 26/36″ export and refinery feed pipelines from Marun No. 1 production unit to Omidiyeh pump station
  • 36″ swing pipeline from Ahwaz to Omidiyeh pump station

The main volumes of project implementation

Earth work

Concrete

Buildings & Shelters

Fenced / Bounded area

Steel structure

Pipeline installation

Piping installation

Cable laying

Equipment installation

LDS signals

LDS telecommunication stations

2,860,000

20,000

80

17,000

280

180

460,000

32

32

600

36

m3

m3

m2

m2

Ton

Km

Inch-Dia

Km

Ton

No.

No.

Project Image Gallery

Related projects

Picture1-1

SPGC Refineries Safety Systems Upgrading Project

Picture5

Kish Gas Field Development Project-Phase 1 BDP & FEED Stage

3-2

Engineering and Technical Services for N.I.O.P.D.C.

5-1

NISOC Flare Gas Recovery Facilities