NISOC Oil Pipelines Project
Project Brief Description
Project Title |
: |
NISOC Oil Pipelines |
Client |
: |
National Iranian South Oilfields Company (NISOC) |
Consultant |
: |
Tarh o Palayesh Engineering Company |
Type of Contract |
: |
Detail Design and Preparation of PC Tender Documents |
Duration of Project |
: |
From 2015 to 2017 |
Cost Estimation |
: |
IRR 5,221,558,000,000 equivalent €108,000,000 |
Engineering Man Hour |
: |
73,400 |
Project Brief Description
|
:
|
In order to maintain production continuity & safe operation, NISOC, by defining this project intends to develop parts of pipelines & relevant facilities including 1)Two 42″ pipelines, both equipped with leak detection system, with total length of 52Km from Omidiyeh pump station (mile 7/77) to Aghajari three-way Junction to bypass Omidiyeh urban area including one pig launching station and 2) One 12″ pipeline with a length of 56Km from Darreh Rig to Sabzab valve station, equipped with leak detection system to bypass Dezful urban area including one launching/receiving station and, 3) one 30″ pipeline from Marun No. 1 production unit to Omidiyeh pump station (mile 7/21) with a length of 73Km, connecting to midway existing facilities tie-in points and fully equipped with leak detection system including two launching/receiving stations and 4) over 450Km of existing pipelines equipped with new leak detection system Detail engineering services as well as PC tender documents Preparation has been performed by TOP Engineering Co. |
Project scope of work
|
|
|
|
|
|
|
|
|
|
|
|
|
The main volumes of project implementation
Earth work
Concrete Buildings & Shelters Fenced / Bounded area Steel structure Pipeline installation Piping installation Cable laying Equipment installation LDS signals LDS telecommunication stations |
2,860,000
20,000 80 17,000 280 180 460,000 32 32 600 36 |
m3
m3 m2 m2 Ton Km Inch-Dia Km Ton No. No. |