Project Brief Description

Project Title              

:

Rey-Sari Oil Product Transmission System Capacity Increase Project

Client

:

Iranian Oil Pipelines & Telecommunication Company (I.O.P.T.C.)

Consultant

:

Tarh o Palayesh Engineering Company

Type of Contract       

:

Basic Design and Preparation of EPC plus Supervision Tender Documents

Duration of Project

:

From 2018 to 2020

Cost Estimation   

:

IRR 8,176,390,000,000 equivalent € 50,928,000

Engineering Man Hour

:

70,500

 

Project Brief Description

 

 

 

 

 

 

 

 

:

 

 

 

 

 

 

 

 

In order to improve the stability of oil product transmission system to the North of Iran and increase the capacity from 50,000 SBPD to 100,000 SBPD, IOPTC by defining this project intends to develop the relevant pipelines, stations, terminals and data telecommunication system including updating 4Km of 16″ existing product pipeline’s thickness from new Moghnak pump station to Veresk pressure reduction station due to capacity increase, designing a new 16″ product pipeline from Veresk pressure reduction station  to Sari oil terminal in length of 92Km and relevant facilities such as LBVs, cathode protection etc., designing required telecommunication platform by use of fiber optic cable in length of 220Km connecting Rey pump station to Sari oil terminal an 6 other stations in between, geotechnical and geophysical stabilization studies for 6km variant of 30-32″ existing pipeline and development of existing stations including Ray pump station, Moghanak new pump station, Veresk pressure reduction station, Golpol pressure reduction station and Sari oil terminal. Basic engineering services as well as EPC tender documents preparation has been performed by TOP Engineering Co.

 

Project scope of work

  • Rey oil transmission station development
  • Moghanak oil transmission station development
  • Veresk pressure reduction station development
  • Golpol pressure reduction station development
  • Sari oil terminal development
  • Thikness updating for the 16″ existing product pipeline’s from Moghnak to Veresk
  • Designing a new 16″ product pipeline from Veresk  to Sari
  • Designing a new fiber optic route from Rey to Sari

The main volumes of project implementation

Earth work

Concrete

Buildings & Shelters

Fenced / Bounded area

Steel structure

Pipeline installation

Piping installation

Cable laying

Fiber Optic Cable

Equipment installation

 

 

1,250,000

14,000

3,170

35,000

300

96

162,000

91

225

290

 

m3

m3

m2

m2

Ton

Km

Inch-Dia

Km

Km

Ton

 

 

Project Image Gallery

Related projects

logo-1

TOTAL SOUTH PARS – OPERATOR TRAINING SIMULATOR (OTS)

logo

HAFTKEL Oil Field Process System Optimization Project

3-2

Karanj-O-Parsi Gas Gathering and Injection Increase Project

4-8

South Gashu Gas Field Development Project