Seventh Refinery Visbreaker Unit

TarhoPalayesh

Project Brief Description

Project Title                      

: Seventh Refinery Visbreaker Unit

Client

: National Iranian Oil Company

Consultant

: Tarh-o-Palayesh Engineering Company

Type of Contract

: Basic and Detailed design engineering, Preparation of Project Material Requisition

Duration of Project

: From 1985 to 1986

Cost Estimation

: 60,000,000 USD

Engineering Man Hour

: 58,000

Project Brief Description

 

:

 

 

In order to construct two Visbreaker unit with 3000 m3/d capacity including equipment such as pressure vessel, columns, furnaces, piping system and etc., basic and detailed engineering based on Isfahan Refinery units and Preparation of Project Material Requisition services have been provided by Tarh-o-Palayesh Engineering Company.

Project scope of work

  • Two visbreaker units
  • Related auxiliary facilities

The main volumes of project implementation

Project Image Gallery

Related projects

4-1

Rey-Sari Oil Product Transmission System Capacity Increase Project

6-2

West Karun Oil Transmission Capacity Increase

5-4

NISOC Gas Pipelines

5-5

NISOC Oil Pipelines Project