SPGC Refineries Safety Systems Upgrading Project
Project Brief Description
| Project Title | : | SPGC Refineries Safety Systems Upgrading Project | 
| Client | : | South Pars Gas Complex Company (SPGC) | 
| Consultant | : | Tarh o Palayesh Engineering Company | 
| Type of Contract | : | Feasibility Study, Basic and Detail Engineering and Preparing PC Tender documents | 
| Duration of Project | : | From 2022-2023 | 
| Cost Estimation | : | — | 
| Engineering Man Hour | : | 85000 | 
| Project Brief Description | : | 
 
 
 
 In order to complete, optimize and upgrade Fire Detection & Extinguishing systems in 12 South Pars Gas Refineries in Asaluye & Kangan, the SPGC defined a project entitled “SPGC Refineries Safety Systems Upgrading Project “.For this purpose, feasibility study, basic and detail engineering and preparing PC tender documents are awarded to TARH-O-PALAYESH Engineering Company. The project consists of 4 following sub-projects: | 
Project scope of work
| · Primary Fire Detection and Extinguishing system constructing for Condensate Storage Tanks in 6 refineries | 
| · Secondary Fire Detection and Extinguishing system development for Condensate Storage Tanks in 8 refineries | 
| · Firefighting Foam Storage and Loading Facility construction in 12 refineries | 
| · Fire Water Storage Tank construction in 6 refineries and Sea Water Storage Tank Construction in one Refinery | 
 
					
													 
			
			 
			
			 
					 
					 
					