SPGC Refineries Safety Systems Upgrading Project

TarhoPalayesh

Project Brief Description

Project Title

:

SPGC Refineries Safety Systems Upgrading Project

Client

:

South Pars Gas Complex Company (SPGC)

Consultant

:

Tarh o Palayesh Engineering Company

Type of Contract

:

Feasibility Study, Basic and Detail Engineering and Preparing PC Tender documents

Duration of Project

:

From 2022-2023

Cost Estimation

:

Engineering Man Hour

:

85000

Project Brief Description

:

 

 

 

 

In order to complete, optimize and upgrade Fire Detection & Extinguishing systems in 12 South Pars Gas Refineries in Asaluye & Kangan, the SPGC defined a project entitled “SPGC Refineries Safety Systems Upgrading Project “.For this purpose, feasibility study, basic and detail engineering and preparing PC tender documents are awarded to TARH-O-PALAYESH Engineering Company. The project consists of 4 following sub-projects:

Project scope of work

·  Primary Fire Detection and Extinguishing system constructing for Condensate Storage Tanks in 6 refineries
·  Secondary Fire Detection and Extinguishing system development for Condensate Storage Tanks in 8 refineries
·  Firefighting Foam Storage and Loading Facility construction in 12 refineries
·   Fire Water Storage Tank construction in 6 refineries and Sea Water Storage Tank Construction in one Refinery

The main volumes of project implementation

Project Image Gallery

Related projects

3-14

Seventh Refinery Visbreaker Unit

2-12

Iran-Japan Petrochemical Complex Feedstock Project (PAJ 1 &2)

5-6

Iran North –West Gas Supply Project

3-10

Sarkhoun II Gas Gathering and Treatment Project