SPGC Refineries Safety Systems Upgrading Project
Project Brief Description
Project Title |
: |
SPGC Refineries Safety Systems Upgrading Project |
Client |
: |
South Pars Gas Complex Company (SPGC) |
Consultant |
: |
Tarh o Palayesh Engineering Company |
Type of Contract |
: |
Feasibility Study, Basic and Detail Engineering and Preparing PC Tender documents |
Duration of Project |
: |
From 2022-2023 |
Cost Estimation |
: |
— |
Engineering Man Hour |
: |
85000 |
Project Brief Description |
: |
In order to complete, optimize and upgrade Fire Detection & Extinguishing systems in 12 South Pars Gas Refineries in Asaluye & Kangan, the SPGC defined a project entitled “SPGC Refineries Safety Systems Upgrading Project “.For this purpose, feasibility study, basic and detail engineering and preparing PC tender documents are awarded to TARH-O-PALAYESH Engineering Company. The project consists of 4 following sub-projects: |
Project scope of work
· Primary Fire Detection and Extinguishing system constructing for Condensate Storage Tanks in 6 refineries |
· Secondary Fire Detection and Extinguishing system development for Condensate Storage Tanks in 8 refineries |
· Firefighting Foam Storage and Loading Facility construction in 12 refineries |
· Fire Water Storage Tank construction in 6 refineries and Sea Water Storage Tank Construction in one Refinery |
The main volumes of project implementation