SPGC Refineries Safety Systems Upgrading Project
Project Brief Description
|
Project Title |
: |
SPGC Refineries Safety Systems Upgrading Project |
|
Client |
: |
South Pars Gas Complex Company (SPGC) |
|
Consultant |
: |
Tarh o Palayesh Engineering Company |
|
Type of Contract |
: |
Feasibility Study, Basic and Detail Engineering and Preparing PC Tender documents |
|
Duration of Project |
: |
From 2022-2023 |
|
Cost Estimation |
: |
— |
|
Engineering Man Hour |
: |
85000 |
|
Project Brief Description |
: |
In order to complete, optimize and upgrade Fire Detection & Extinguishing systems in 12 South Pars Gas Refineries in Asaluye & Kangan, the SPGC defined a project entitled “SPGC Refineries Safety Systems Upgrading Project “.For this purpose, feasibility study, basic and detail engineering and preparing PC tender documents are awarded to TARH-O-PALAYESH Engineering Company. The project consists of 4 following sub-projects: |
Project scope of work
| · Primary Fire Detection and Extinguishing system constructing for Condensate Storage Tanks in 6 refineries |
| · Secondary Fire Detection and Extinguishing system development for Condensate Storage Tanks in 8 refineries |
| · Firefighting Foam Storage and Loading Facility construction in 12 refineries |
| · Fire Water Storage Tank construction in 6 refineries and Sea Water Storage Tank Construction in one Refinery |
The main volumes of project implementation
Project Image Gallery
Related projects
- « Previous
- 1
- …
- 3
- 4
- 5