West Karun Oil Transmission Capacity Increase

TarhoPalayesh

Project Brief Description

Project Title              

:

West Karun Oil Transmission Capacity Increase

Client

:

Petroleum Engineering Development Company (P.E.D.E.C.)

Consultant

:

Tarh o Palayesh Engineering Company

Type of Contract       

:

Basic Design Studies and Preparation of EPC Tender Package

Duration of Project

:

From 2016 to 2017

Cost Estimation   

:

RLS. 19000 Billion equivalently 500,000,000 Euro Based on project date exchange rate

Engineering Man Hour

:

72,500

Project Brief Description

 

:

 

 

In order to enhance oil transmission capacity up to 1 million Barrels per day, P.E.D.E.C has defined the above mentioned project to provide the necessary facilities such as West Karun and Omidiyeh pump stations, 390 km of pipelines including 42″ heavy oil and 30″ light oil pipelines, Bahregan metering, leak detection system for new pipelines (390 km) and existing pipelines (345 km). Basic Design Tender perpetration have been perform by Tarh o Palayesh Engineering Company.  

Project scope of work

  • West Karun pump station’s development
  • Omidiyeh pump station’s development
  • 42 inch pipeline from west Karun pump station to Petro Omid-e-Asia tankage area
  • 30″ pipeline from Koriet camp to Omidiyeh pump station
  • Bahregan metering station
  • Leak detection system for new and existing pipelines from west Karun pump station to Bahregan metering station

The main volumes of project implementation

Earth work 9,120,000 m3
Concrete 35,000 m3
Buildings & Shelters 12,000 m2
Fenced / Bounded area 210,000 m2
Steel structure 1,500 Ton
Pipeline installation 390 Km
Cable laying 300 Km
Fiber optic cable 720 Km
Pipeline/ Piping 1,384,000 Inch-Dia
Equipment installation 1,500 Ton
Centrifugal Pumps installation 24 No
Control/ F&G/ ESD sys. (I/O Count) 1,500 No

Project Image Gallery

Related projects

4-1

Rey-Sari Oil Product Transmission System Capacity Increase Project

5-4

NISOC Gas Pipelines

5-5

NISOC Oil Pipelines Project

3-8

Marun Khami Gas Condensate Transmission and Exportation Project