Esfahan DMT Factory Waste Water Treatment Unit Project

TarhoPalayesh

Project Brief Description

Project Title                      

:

Esfahan DMT Factory Waste Water Treatment Unit Project

Client

:

Fiber Intermediate Production Company

Consultant

:

Tarh-O-Palayesh Engineering Company

Type of Contract

:

Basic, Detail Engineering and Preparation of Material Requisitions

Duration of Project

:

From 1989 To 1990

Cost Estimation

:

500,000 USD

Engineering Man Hour

:

9,000

Project Brief Description

 

 

 

:

 

 

 

 

In order to gather, separate, treat and neutralize the waste water, Fiber Intermediate Production Company intends to install waste water treatment system and required facilities. Basic, detail design and preparation of material requisitions have been performed by TOP engineering co

 

 

 

Project scope of work

  • Waste water gathering system
  • Waste water separation system
  • Biological treatment system
  • Waste water neutralizing and discharging system

The main volumes of project implementation

Project Image Gallery

Related projects

Picture1-1

SPGC Refineries Safety Systems Upgrading Project

Picture5

Kish Gas Field Development Project-Phase 1 BDP & FEED Stage

3-2

Engineering and Technical Services for N.I.O.P.D.C.

5-1

NISOC Flare Gas Recovery Facilities